01 / PROJECT OVERVIEW
THE PROJECT
KGK Scaffolding was entrusted with delivering an extensive scaffolding, edge-protection and temporary-access package at Project Redkite, a major hyperscale data-centre development in Slough.
Forming part of Slough’s established data-centre cluster, Project Redkite represents the type of large-scale, mission-critical digital infrastructure increasingly essential to the UK’s technology sector. Projects of this nature are characterised by demanding construction programmes, extensive building services and significant coordination between specialist contractors.
KGK provided access solutions supporting multiple disciplines across the development, including steelwork, roofing, cladding, concrete and M&E activities, requiring the scaffolding package to continually respond to changing construction sequences and site requirements.
The works incorporated extensive edge-protection systems, HAKI stair access, scaffold access towers, temporary staircases and platforms, loading arrangements, exclusion zones, lifting gates and bespoke protection solutions across the project.
With construction progressing across numerous work fronts simultaneously, ongoing scaffold alterations and adaptations formed a significant part of the package, ensuring access arrangements continued to support the evolving requirements of the wider programme.
Delivering within such a large-scale and technically demanding data-centre environment required detailed coordination, flexibility and responsive temporary-works planning throughout, demonstrating KGK’s capability to support complex mission-critical construction projects.
PROJECT DETAILS
LOCATION
Slough, Berkshire
PROJECT TYPE
Data Centre / Complex Access
SERVICES PROVIDED
Edge Protection HAKI Stair Access Loading Platforms Access Towers Temporary Access Scaffold Alterations Temporary Works
02 / SCOPE OF WORKS
The project included:
Extensive edge-protection systems
HAKI stair access
Loading platforms and revised loading arrangements
Scaffold access towers
Temporary staircases and access platforms
Bespoke edge-protection arrangements
Exclusion zones and lifting gates
Ongoing scaffold alterations and adaptations
Temporary works to support changing site requirements
Access solutions supporting steelwork, roofing, cladding, concrete and M&E activities
03 / REQUIREMENTS & CHALLENGES
Project Redkite presented a fast-moving and continually evolving access requirement, with multiple specialist trades operating across different areas of the development simultaneously.
KGK was required to coordinate scaffold access supporting steelwork, roofing, cladding, concrete and M&E installations, with access requirements changing as different stages of construction progressed.
Extensive edge protection, HAKI stair systems, loading platforms, access towers and temporary staircases had to be carefully integrated with the wider construction programme. Bespoke edge-protection arrangements, lifting gates, exclusion zones and revised loading configurations were introduced where standard access arrangements were not suitable.
A major challenge was the need for continuous scaffold alterations and adaptations, allowing the temporary works to evolve alongside the structure while maintaining safe access for multiple trades and avoiding unnecessary disruption to programme-critical activities.
The scale and pace of the hyperscale development meant the scaffolding could not operate as a fixed installation; it had to function as a responsive temporary-access system capable of adapting to changing site conditions throughout the build.
04 / PROJECT OUTCOME
Project Redkite presented a fast-moving and continually evolving access requirement, with multiple specialist trades operating across different areas of the development simultaneously.
KGK was required to coordinate scaffold access supporting steelwork, roofing, cladding, concrete and M&E installations, with access requirements changing as different stages of construction progressed.
Extensive edge protection, HAKI stair systems, loading platforms, access towers and temporary staircases had to be carefully integrated with the wider construction programme. Bespoke edge-protection arrangements, lifting gates, exclusion zones and revised loading configurations were introduced where standard access arrangements were not suitable.
A major challenge was the need for continuous scaffold alterations and adaptations, allowing the temporary works to evolve alongside the structure while maintaining safe access for multiple trades and avoiding unnecessary disruption to programme-critical activities.
The scale and pace of the hyperscale development meant the scaffolding could not operate as a fixed installation; it had to function as a responsive temporary-access system capable of adapting to changing site conditions throughout the build.

KGK SCAFFOLDING LTD
Established scaffolding contractor providing safe access solutions across London, Essex, the South East and beyond.
Safe access. Reliable delivery.